Server handling in tight spaces: Euclyde’s Lyon data centre
Server handling in tight spaces: Euclyde’s Lyon data centre

Euclyde Datacentres selected a Lift&Drive DC09 U52 server and battery lifter for its Lyon facility, where narrow passageways and overhead cable routes made equipment access a particular challenge.

The Pronomic customer case study describes an edge data centre providing local hosting for businesses. When clients needed to work on their servers, there were not always enough staff available to help with handling. Euclyde wanted equipment that clients could use to position servers while reducing the risk of injury and damage.

A lifter that could follow the access route

Reaching the rack was only part of the task. The lifter also had to pass beneath cable gates and through low, narrow passages. Euclyde selected the DC09 U52 because its telescopic mast could retract for these routes and extend to reach the upper rack positions.

A tight turning radius helped it negotiate confined bends. The adjustable handlebar allowed different users to set a suitable operating position.

Local support mattered too

Alongside the physical fit, Euclyde wanted a supplier nearby. Pronomic emerged as a potential supplier during the search for a handling solution.

“It was important to us to have a local company close to us.”

Olivier Nambrard, Operational Manager, Euclyde Datacentres

Access across the rack

The case study reports that the selected lifter allowed servers to be mounted throughout the racks while fitting the facility’s restricted layout. It also highlights straightforward operation for different users, an important consideration where clients work on their own equipment.

The project illustrates why server-lifter selection needs to consider the complete route: rack height, doorway clearance, overhead obstructions, aisle width and turning space, as well as the load.

Read the case study

Download the Euclyde Datacentre customer case study (PDF) →

For equipment details, see the Lift&Drive DC09 U52 or explore the server-lift range.

Discuss your data centre handling requirements →

Based on Pronomic’s Euclyde Datacentres customer case study. The project described is at Euclyde’s Lyon facility.